If you have difficulty downloading documents, please email This email address is being protected from spambots. You need JavaScript enabled to view it.
Draft EIS – Chapters
- Executive Summary & Table of Contents (
1.8 MB) - Chapter 1 – Introduction (
1.5 MB) - Chapter 2 – Project Proponent (
1.4 MB) - Chapter 3 – Site Description (
4.1 MB) - Chapter 4 – Project Description (
4.6 MB) - Chapter 5 – Legal and Other Requirements (
973 KB) - Chapter 6 – Land Use and Visual Impacts (
7.4 MB) - Chapter 7 – Infrastructure (
3.9 MB) - Chapter 8 – Flora and Fauna (
6.1 MB) - Chapter 9 – Water Quality (
2.1 MB) - Chapter 10 – Water Resources (
1.2 MB) - Chapter 11 – Social and Economics (
3.1 MB) - Chapter 12 – Air (
1.2 MB) - Chapter 13 – Transport (
2.9 MB) - Chapter 14 – Noise and Vibration (
2.9 MB) - Chapter 15 – Waste Management (
1.3 MB) - Chapter 16 – Biosecurity (
1.1 MB) - Chapter 17 – Cultural Heritage (
5.3 MB) - Chapter 18 – Hazards, Health and Safety (
8.4 MB) - Chapter 19 – Matters of national environmental significance (
21.5 MB) - Chapter 20 – Cumulative Impacts (
1.9 MB) - Chapter 21 – Environmental Monitoring and Management Plans (
1.1 MB)
Draft EIS– Appendices
- Terms of Reference Cross Reference (
478 KB) - Appendix 1 – Soils and Geology (
8.9 MB) - Appendix 2A – Reference Design Drawings (
40.5 MB) - Appendix 2B – KUR-World Draft Plan of Development (
32.6 MB) - Appendix 3A – Fact Sheet Regional Plans (
185 KB) - Appendix 3B – Applicable Land Use Definitions (
785 KB) - Appendix 3C – Visual Impact Assessment (
34.6 MB) - Appendix 3D – Native Title Tenure Assessment (
1.5 MB) - Appendix 4A – Effluent Irrigation Study (
5.7 MB) - Appendix 4B – KUR-World Water and Wastewater Infrastructure Technical Report (
32.6 MB) - Appendix 4C – Energy Load Profiles, Space Type Load Profiles and Detailed Operational Waste Forecast (
413 KB) - Appendix 5 – Flora and Fauna Technical Report (
31.4 MB) - Appendix 6 – Water Quality and Aquatic Ecology Technical Report (
23.7 MB) - Appendix 7 – Surface Water Hydrology Technical Note (
12.7 MB) - Appendix 8A – Social and Economic Profile (
1.7 MB) - Appendix 8B – Economic Impact Assessment (
1.7 MB) - Appendix 8C – Indigenous Community Profile (
987 KB) - Appendix 9 – Stakeholder Engagement Plan (
1.2 MB) - Appendix 10 – Regional Supply Capacity (
649 KB) - Appendix 11 – Community Engagement (
4.2 MB) - Appendix 12 – Air Quality Impact Assessment (
3.8 MB) - Appendix 13 – Transport Modelling Data (
30.5 MB) - Appendix 14 – Noise and Vibration Impact Assessment (
17.2 MB) - Appendix 15 – Indigenous Cultural Heritage Assessment (
25.6 MB) - Appendix 16 – Indigenous Social Issues Paper (
624 KB) - Appendix 17 – Non-Indigenous Cultural Heritage Assessments (
8.8 MB) - Appendix 18 – Hazards, Health and Safety Assessment (
34.4 MB) - Appendix 19 – Flooding Technical Reporting (
4.6 MB) - Appendix 20 – Proponent Commitments (
368 MB) - Technical note – Stormwater Drainage Strategy (as referenced in Chapters 7 and 9) (
368 MB)
