Byerwen Coal Project's Environmental Impact Statement documents
If you have difficulty downloading documents, please email cpdinfo@coordinatorgeneral.qld.gov.au
EIS - Chapters
- Executive Summary (
6.74 MB)
- EIS Cover Page (
1.22 MB)
- EIS Table of Contents (
2.1 MB)
- 01 – Introduction (
2.78 MB)
- 02 – Project Rationale and Alternatives (
2.36 MB)
- 03 – Project Approvals (
2.18 MB)
- 04 – Public Consultation (
2.48 MB)
- 05 – Project Location (
6.31 MB)
- 06 – Construction (
2.83 MB)
- 07 – Operation (
5.33 MB)
- 08 – Water Management (
29.3 MB)
- 09 – Waste Rock and Rejects (
2.57 MB)
- 10 – Decommissioning and Rehabilitation (
5.71 MB)
- 11 – Final Voids (
2.45 MB)
- 12 – Climate and Climate Change (
2.49 MB)
- 13 – Geology, Topography and Soils (
3.68 MB)
- 14 – Land Use, Tenure and Contamination (
5.85 MB)
- 15 – Surface Water Quality (
6.4 MB)
- 16 – Hydrology and Hydraulics (
10.6 MB)
- 17 – Groundwater (
4.0 MB)
- 18 – Terrestrial Ecology (
7.57 MB)
- 19 – Aquatic Ecology (
2.83 MB)
- 20 – Stygofauna (
2.4 MB)
- 21 – Environmental Offsets (
2.43 MB)
- 22 – Air Quality (
2.43 MB)
- 23 – Greenhouse Gas (
1.95 MB)
- 24 – Noise and Vibration (
4.17 MB)
- 25 – Landscape and Visual Amenity (
4.04 MB)
- 26 – Waste Management (
2.02 MB)
- 27 – Traffic and Transport (
2.6 MB)
- 28 – Indigenous Cultural Heritage (
2.24 MB)
- 29 – Historical Cultural Heritage (
2.7 MB)
- 30 – Economics (
2.23 MB)
- 31 – Social Impacts (
2.82 MB)
- 32 – Hazard and Risk (
2.3 MB)
- 33 – Health and Safety (
2.03 MB)
- 34 – Cumulative Impact Assessment (
3.15 MB)
- 35 – Matters of National Environmental Significant (
7.16 MB)
- 36 – References (
2.06 MB)
EIS - Appendices
- Appendix 1 – Terms of Reference (
2.17 MB)
- Appendix 2 – TOR Cross Reference Table (
2.78 MB)
- Appendix 3 – Project Approvals (
2.0 MB)
- Appendix 4 – Study Team (
2.0 MB)
- Appendix 5 – Glossary (
2.07 MB)
- Appendix 6 – Acronyms and Abbreviations (
1.97 MB)
- Appendix 7 – Corporate Environment Policy (
1.96 MB)
- Appendix 8 – Commitments (
2.23 MB)
- Appendix 9 – Environmental Management Plan (
30.4 MB)
- Appendix 10 – Social Impact Management Plan (
3.33 MB)
- Appendix 11 – Mine Water Management Strategy (
7.24 MB)
- Appendix 12 – Geochemical Access of Spoil and Potential Coal Reject Materials (
4.07 MB)
- Appendix 13 – Final Void Assessment (
4.9 MB)
- Appendix 14 – Land Technical Report (
25.2 MB)
- Appendix 15 – Preliminary Site Investigation Contaminated Land (
4.7 MB)
- Appendix 16 – Assessment of Surface Water Environmental Values (
6.6 MB)
- Appendix 17 – Hydrology and Flooding Assessment Report (
9.94 MB)
- Appendix 18 – Groundwater Assessment (
7.94 MB)
- Appendix 19 – Terrestrial Ecology Assessment (
38.0 MB)
- Appendix 20 – Aquatic Ecology Assessment (
6.55 MB)
- Appendix 21 – Stygofauna Pilot Survey (
3.63 MB)
- Appendix 22 – Matters of Environmental Significance Assessment Report (
12.8 MB)
- Appendix 23 – Air and Greenhouse Gas Assessment (
4.71 MB)
- Appendix 24 – Noise and Vibration Assessment (
4.08 MB)
- Appendix 25 – Visual Impact Assessment (
15.2 MB)
- Appendix 26 – Transport Impact Assessment Report (
4.15 MB)
- Appendix 27 – Non-Indigenous History Technical Report (
2.77 MB)
- Appendix 28 – Indigenous Cultural Heritage Birri Native Title Area (
4.9 MB)
- Appendix 29 – Indigenous Cultural Heritage Jangga Native Title Area (
3.74 MB)
- Appendix 30 – Economic Impact Assessment (
8.87 MB)
- Appendix 31 – Social Impact Assessment (
3.77 MB)
- Appendix 32 – Hazard and Risk Assessment Report (
7.12 MB)
- Appendix 33 – Draft Emergency Management (
1.96 MB)
Further information
Last updated: 16 Mar 2023