Supplementary environmental impact statement
Carmichael Coal Mine and Rail Project
If you have difficulty downloading documents, please email cpdinfo@coordinatorgeneral.qld.gov.au
Volumes 1–3
- Volume 1 - Project Wide Studies (
1.9 MB)
- Volume 2 - Mine Studies (
2.4 MB)
- Volume 3 - Rail Studies (
5.3 MB)
Volume 4 – Appendices
- Appendix A - Submissions Register (
2.5 MB)
- Appendix B - Updated Mine Project Description (
8.1 MB)
- Appendix C1 - Project Approvals Report (
4.3 MB)
- Appendix C2 - Mine Applications (
142 KB)
- Appendix C3a – Material Change of Use Applications for Rail Laydown Areas:
- Appendix C3a – Parts 1–5 (
26.2 MB)
- Appendix C3a – Parts 6–9 (
14.8 MB)
- Appendix C3b – Operational Works Applications for Excavation and Filling for the Rail Corridor:
- Appendix C3b - Part 1 (
27.5 MB)
- Appendix C3b - Part 2 (
22.5 MB)
- Appendix C3b - Part 3 (
15.5 MB)
- Appendix C3b - Part 4 (
15.7 MB)
- Appendix C3b - Part 5 (
25.8 MB)
- Appendix C3b - Part 6 (
15.2 MB)
- Appendix C3b - Part 7 (
14.5 MB)
- Appendix C3c - Updated Application Forms For Rail Camps 1 to 3:
- Appendix C3c - Camp 1 (
282 KB)
- Appendix C3c - Camp 2 (
307 KB)
- Appendix C3c - Camp 3 (
305 KB)
- Appendix C3d - Vegetation Reports for SP1 and Laydown Areas:
- Appendix C3d - SP1 Laydown Area Vegetation Reports (
6.4 MB)
- Appendix C3d - SP1 Rail Alignment Vegetation Reports Part 1 (
14.4 MB)
- Appendix C3d - SP1 Rail Alignment Vegetation Reports Part 2 (
43.0 MB)
- Appendix C3e - Waterway Barrier Application for the Project (Rail) west (
12.8 MB)
- Appendix C3f - Vegetation Reports for SP2 and Laydown Areas:
- Appendix C3f - Part 1 (
15.7 MB)
- Appendix C3f - Part 2 (
4.94 MB)
- Appendix C3f - Part 3 (
22.5 MB)
- Appendix C3f - Part 4 (
22.8 MB)
- Appendix C3g - Species Management Plan for the Project (Rail) (
11.2 MB)
- Appendix C3h - Watercourse Determination for the Project (Rail) (
6.5 MB)
- Appendix C3i - SP1 Construction Water Application (
2.7 MB)
- Appendix C4a - Application for Preliminary Approval (Planning) (
17.8 MB)
- Appendix C4b - Mine Workers Accommodation Village Approval Applications (
36.5 MB)
- Appendix C4c - Industrial Precinct approval applications (
39.8 MB)
- Appendix C4d - Airport Approval Applications (
47.5 MB)
- Appendix C4e - Application to take water from the Belyando River (
9.7 MB)
- Appendix C5a – Quarry Application - Borrow 7 (
40.5 MB)
- Appendix C5b – Quarry Application - Disney Quarry (
35.0 MB)
- Appendix C5c – Quarry Application - Moray Quarry (
30.5 MB)
- Appendix C5d – Quarry Application - North Creek Quarry (
28.0 MB)
- Appendix C5e – Quarry Application - South Back Creek Quarry (
24.5 MB)
- Appendix C5f - NCA Vegetation Clearing Permit Application (
3.9 MB)
- Appendix C6 - Proposed Draft Approvals Report (
2.3 MB)
- Appendix D1 - Revised Social Impact Assessment Report (
5.6 MB)
- Appendix D2 - Draft Social Impact Management Plan (
4.0 MB)
- Appendix E - Economic Assessment Report (
2.5 MB)
- Appendix F - Environmental Offset Package (
1.5 MB)
- Appendix G - Project Commitments (
1.1 MB)
- Appendix H - Matters of National Environmental Significance Report (
26.0 MB)
- Appendix I1 - Revised Subsidence Assessment Report (
47.8 MB)
- Appendix I2 - Draft Subsidence Management Plan (
18.0 MB)
- Appendix J1 - Updated Mine Ecology Report (
9.3 MB)
- Appendix J2 - BTF On-Site Monitoring Survey Report (
2.5 MB)
- Appendix J3 - Doongmabulla & Mellaluka Springs Report (
11.4 MB)
- Appendix J4 - Population Survey of the Waxy Cabbage Palm Report (
11.4 MB)
- Appendix J5 - Offsite Infrastructure Ecological Assessment Report (
12.9 MB)
- Appendix J6 - Offsite Infrastructure BioCondition Assessment Report (
8.1 MB)
- Appendix J7a - Offsite Infrastructure PMAV Report (
11.6 MB)
- Appendix J7b - Offsite Infrastructure PVMP Report (
2.6 MB)
- Appendix J8 - Great Barrier Reef Wetland Protection Areas (
3.4 MB)
- Appendix J9 - Adani Quarries Environmental Impact Review (
25.6 MB)
- Appendix K1 - Mine Hydrogeology Report (
21.0 MB)
- Appendix K2 - Water Balance Report (
13.5 MB)
- Appendix K3 - Mine Water Quality Report (
26.5 MB)
- Appendix K4 - Flood Mitigation and Creek Diversion Design Report (
20.3 MB)
- Appendix K5 - Updated Mine Hydrology Report (
26.5 MB)
- Appendix K6 - Mine Hydrogeology Report Addendum (
42.9 MB)
- Appendix K7 - Numerical Groundwater Model Peer Review (
299 KB)
- Appendix K8 - Groundwater Model Peer Review Comments (
142 KB)
- Appendix L - Revised Mine Air Quality Assessment Report (
4.6 MB)
- Appendix M - Greenhouse Gas Emissions Report (
2.0 MB)
- Appendix N - Updated Mine Noise and Vibration Assessment Report (
20.3 MB)
- Appendix O1 - Mine Waste Characterisation Report (
7.1 MB)
- Appendix O2 - Mine Waste Management Strategy (
2.4 MB)
- Appendix O3 - Landform Design Study Report (
2.8 MB)
- Appendix P - Traffic Impact Assessment Report (
6.8 MB)
- Appendix Q1 - Environmental Management Plan - Mine (
3.1 MB)
- Appendix Q2 - Environmental Management Plan - Offsite (
927 KB)
- Appendix R1 - Mine Closure and Rehabilitation Strategy (
5.6 MB)
- Appendix R2 - Offsite Closure and Rehabilitation Strategy (
1.1 MB)
- Appendix S1 - Rail Hydrology Report:
- Appendix S1a - Rail Hydrology Report (
6.7 MB)
- Appendix S1b - Rail Hydrology and Hydraulics Project Design Criteria (
265 KB)
- Appendix S1c - Rail Hydrology Drawings (
65.3 MB)
- Appendix S2 - Bushfire Management Plan (
11.9 MB)
- Appendix T1 - Strategic Cropping Land Assessment Report (
24.4 MB)
- Appendix T2 - Rail Soil Survey Methodology (
5.9 MB)
- Appendix U - Fauna Crossing Strategy (
10.5 MB)
- Appendix V - Emergency Management Plan (
9.1 MB)
- Appendix W - Environmental Management Plan - Rail (
4.0 MB)
- Appendix X1 - Preliminary Closure and Rehabilitation Strategy - Rail (
4.1 MB)
- Appendix X2 - Preliminary Closure and Rehabilitation Strategy - Quarries (
2.0 MB)
Read the project's environmental impact statement (EIS)
Read more about the project
Read more about the EIS/IAR process
Last updated: 16 Mar 2023