Galilee Coal Project (Northern Export Facility) - Supplementary information to the EIS
Supplementary EIS - Volume 1
- Table of Contents (
382 KB)
- Part A - Introduction and revised Executive Summary (
10.9 MB)
- Part B - EIS Eratta (
98 KB)
- Part C - 01 Climate and Climate Change Adaptation (
97 KB)
- Part C - 02 Land (
6.3 MB)
- Part C - 03 Nature Conservation (
2.2 MB)
- Part C - 04 Water Resources (
2.6 MB)
- Part C - 05 Coastal Environment (
76 KB)
- Part C - 06 Air Quality (
4.1 MB)
- Part C - 07 Noise and Vibration (
419 KB)
- Part C - 08 Waste (
136 KB)
- Part C - 09 Transport (
599 KB)
- Part C - 10 Indigenous Cultural Heritage (
78 KB)
- Part C - 11 Non-indigenous Cultural Heritage (
65 KB)
- Part C - 12 Social (
764 KB)
- Part C - 13 Health and Safety (
152 KB)
- Part C - 14 Economy (
230 KB)
- Part C - 15 Sustainable Development (
76 KB)
- Part C - 16 Hazard and Risk (
1.1 MB)
- Part C - 17 Cumulative Impacts (
2.9 MB)
- Part C - 18 Environmental Management Plan (
2.1 MB)
- Part C - 19 Decommissioning and Rehabilitation (
122 KB)
- Part C - Project Approvals (
2.1 MB)
- Part C - Project Description (
4.3 MB)
Supplementary EIS - Volume 2
- 01 Potential Approvals Pathway (
226 KB)
- 02 Notifiable Activities (
109 KB)
- 03 Potential ERAs (
102 KB)
- 04 Central West Regional Plan Assessment (
409 KB)
- 05 Bowen Abbot Point Accommodation Study (
215 KB)
- 06 Jericho Regional Plan Assessment (
149 KB)
- 07 Soils and Land Suitability Report (
9.3 MB)
- 08 Supplementary Soil Survey for Open Cut Area (
7.1 MB)
- 09 Tailings Storage Facility Update (
4.6 MB)
- 10 Waste Rock, Rejects and Tailings (
8.7 MB)
- 11 Prelim Report First Stage Geochemical Assessment (
3.7 MB)
- 12 EIS Vol 5 App 1 - Appendices A to E (
14.5 MB)
- 13 Phase 1 Environmental Site Assessment Contaminated Land (
15.1 MB)
- 14 Fauna Assessment Report (
10.9 MB)
- 15 Rail Fauna Position Paper (
188 KB)
- 16 Veg Report 1 - Spring Creek Flora and Vegetation Assessment (
2.9 MB)
- 17 Veg Report 2 - Flora and Vegetation Assessment (
27 MB)
- 18 Initial Biosecurity Management Strategy (
4.5 MB)
- 19 Mine Aquatic Ecology and Water Quality (
18.5 MB)
- 20 Subterranean Fauna Survey (
1.6 MB)
- 21 Environmental Values Identification for Galilee Coal Mine (
12.5 MB)
- 22 Mine Water Quality Monitoring Program (
1.9 MB)
- 23 Rail Aquatic Ecology and Water Quality (
20 MB)
- 24 Mine Site Water Management System (
5.1 MB)
- 25 Surface Water Impact Assessment of Longwall Mining Subsidence (
8.6 MB)
- 26 Mine Site Creek Diversion and Flooding (
9.8 MB)
- 27 Rail Corridor Cross Drainage (
18.3 MB)
- 28 Noise Assessment Report (
3.1 MB)
- 29 Traffic Engineering Report (
2.3 MB)
- 30 Social Impact Management Plan (SIMP) (
2.6 MB)
- 31 RP Data Galilee Basin Housing Market Analysis (
714 KB)
- 32 Galilee Coal Project Economic Modelling Results (
36 KB)
- 33 Initial Bushfire Management Planning Framework (
9.1 MB)
- 34 Initial Emergency Response Plan Framework (
770 KB)
- 35 Biodiversity Offset Proposal (
1.9 MB)
- 36 Draft Environmental Management Plan (EM Plan) Mine (
22.5 MB)
- 37 Draft Environmental Management Plan (EMP) Rail (
3.6 MB)
- 38 Rail Concept Design Report (
2.5 MB)
- 39 Rail Concept Drawings Longitudinal Sections (
10.6 MB)
- 40 Rail Alignment through MLAs 70426 and 70425 (
10.9 MB)
- 41 Longwall Mining Subsidence Report (
80.8 MB)
- 42 Updated Cumulative Impact Assessment (
3.6 MB)
- 43 Galilee Coal Project Groundwater Assessment (
17.8 MB)
- 44 Commitments (
179 KB)
Last updated: 16 Mar 2023