Sunshine Coast Airport Expansion project's environmental impact statement documents
Further information provided by the proponent
- Difference in number of dwellings in N70 contours 2020 and 2040 summer weekday (fixed wing and helicopter) (
50 KB)
- N70 Combined Fixed Wing and Helicopter Summer Weekday Day (
2.1 MB)
- N70 Combined Fixed Wing and Helicopter Summer Weekday Evening (
1.4 MB)
- N70 Combined Fixed Wing and Helicopter Suburb Comparisons (
11.3 MB)
- N70 Combined Fixed Wing and Helicopter Community Facilities (
22.7 MB)
- Accommodation Facilities–N70 2012 Existing Summer Weekday Day (fixed wing and helicopter) (
28.9 MB)
- Accommodation Facilities–N70 2020 Do Minimum Summer Weekday Day (fixed wing and helicopter) (
28.9 MB)
- Accommodation Facilities–N70 2040 Do Minimum Summer Weekday Day (fixed wing and helicopter) (
28.9 MB)
Additional information to the Environmental Impact Statement
Additional information to the Environmental Impact Statement ( 11.9 MB)
Appendices:
- Appendix A – Engagement Activities undertaken during the Public Notification Period for the EIS (
164 KB)
- Appendix B – Biodiversity Offsets Strategy (
8.72 MB)
- Appendix C – Environmental Management Framework for Acid Sulfate Soils (
486 KB)
- Appendix D – Water Quality Management Plan and additional survey and assessments for Marcoola Drain (
5.11 MB)
- Appendix E – Targeted survey for Lesser Swamp Orchid (
5.08 MB)
- Appendix F – Engineering advice about alternate tailwater discharge options (
474 KB)
- Appendix G – Summary of the likelihood of occurrence and assessment for relevant MNES species (
377 KB)
- Appendix H – Additional air quality information (
679 KB)
- Appendix I – Additional surface transport information (
1.81 MB)
- Appendix J – Additional flood modelling information (
1.66 MB)
- Appendix K – Revised Public Safety Area Map for the airport (
373 KB)
- Appendix L – Additional aircraft noise maps and information (
12.7 MB)
- Appendix M – Additional economics information (
836 KB)
Environmental Impact Statement
- Summary of Major Findings (
5.4 MB)
- Aircraft Noise Information Booklet (
7.7 MB)
EIS - Volume A: Background to the Project
Chapters:
- Chapter A1 - Introduction (
1.9 MB)
- Chapter A2 - Need for the Project (
2.8 MB)
- Chapter A3 - Options and Alternatives (
5.1 MB)
- Chapter A4 - Project Description (
3.5 MB)
- Chapter A5 - Project Construction (
4.6 MB)
- Chapter A6 - Planning and Legislation Review (
6.9 MB)
- Chapter A7 - Stakeholder Engagement (
2.2 MB)
- Chapter A8 - Sustainability (
1.3 MB)
- Chapter A9 - Environmental Impact Assessment Process (
1.3 MB)
Appendices:
- Appendix A2A - Busy day flight schedules for 2020 and 2040 (
647 KB)
- Appendix A2B - Long-term forecasts of aviation activity at Sunshine Coast Airport for 2013-2050 (
6.4 MB)
- Appendix A7A - Stakeholder engagement summary (
1.0 MB)
- Appendix A7B - Engagement materials (
2.5 MB)
- Appendix A9A - Terms of Reference for EIS (
1.4 MB)
EIS - Volume B: Airport and Surrounds
Chapters:
- Chapter B1 - Introduction (
1.4 MB)
- Chapter B2 - Land Use & Tenure (
2.4 MB)
- Chapter B3 - Geology, Soils and Groundwater (
4.2 MB)
- Chapter B4 - Coastal Processes (
2.7 MB)
- Chapter B5 - Flooding (
5.4 MB
- Chapter B6 - Surface Water and Hydrology (
15.9 MB)
- Chapter B7 - Terrestrial Flora (
4.2 MB)
- Chapter B8 - Terrestrial Fauna (
7.4 MB)
- Chapter B9 - Aquatic Ecology (
2.3 MB)
- Chapter B10 - Marine Ecology (
9.6 MB)
- Chapter B11 - Indigenous Cultural Heritage and Native Title (
1.3 MB)
- Chapter B12 - Non-Indigenous Cultural Heritage (
4.9 MB)
- Chapter B13 - Social Impact (
1.7 MB)
- Chapter B14 - Surface Transport (
2.7 MB)
- Chapter B15 - Noise and Vibration (
2.9 MB)
- Chapter B16 - Air Quality and Greenhouse Gas Emissions (
3.3 MB)
- Chapter B17 - Landscape and Visual (
1.9 MB)
- Chapter B18 - Climate Change (
3.3 MB)
Appendices:
- Appendix B3A - Geotechnical borehole reports, DCP reports, explanatory notes (
1.8 MB)
- Appendix B3B - Acid sulfate soil Table A1 and A2 (
2.3 MB)
- Appendix B3C - Erosion and sediment control field test results and soil logs (
1.3 MB)
- Appendix B3D - Groundwater standpipe reports (
1.3 MB)
- Appendix B3E - Erosion and sediment control laboratory test reports (
3.3 MB)
- Appendix B3F - Geotechnical laboratory test reports (
3.0 MB)
- Appendix B3G - Geotechnical settlement analyses (
1.2 MB)
- Appendix B3H - Acid sulfate soil borehole reports (
1.1 MB)
- Appendix B3I - Contaminated land title certificates (
5.9 MB)
- Appendix B3J - Aerial photographs (
2.7 MB)
- Appendix B3K - Contaminated land laboratory test reports (
2.3 MB)
- Appendix B3L - Contaminated land QA/QC documentation (
1.0 MB)
- Appendix B3M - Results of groundwater level measurement (
1.1 MB)
- Appendix B4A - Storm erosion potential estimates (
1.0 MB)
- Appendix B6A - Modelling suite development and validation (
2.8 MB)
- Appendix B7A - Wildlife online search results (
1.2 MB)
- Appendix B7B - EPBC protected matters search tool results (
1.0 MB)
- Appendix B8A - Endangered, vulnerable and near threatened species list (
649 KB)
- Appendix B8B - All species list (
813 KB)
- Appendix B9A - Raw macroinvertebrate data (
1.4 MB)
- Appendix B9B - Ecological characteristics of key native fish species recorded from Sunshine Coast Airport site (
978 KB)
- Appendix B9C - Details of database searches (
1.0 MB)
- Appendix B10A - EPBC protected matters search results (
667 KB)
- Appendix B10B - Wildlife online search results (
1.1 MB)
- Appendix B10C - Raw macroinvertebrate data (Marcoola Drain) (
955 KB)
- Appendix B10D - Matters of National Environmental Significance (
997 KB)
- Appendix B12A - Incidental finds procedure (
878 KB)
- Appendix B15A - Wind roses (
1.0 MB)
- Appendix B15B - Noise measurement results (
2.3 MB)
- Appendix B16A - Model setup (
959 KB)
- Appendix B16B - Inputs to estimation of GHG emissions from waste (
932 KB)
- Appendix B16C - TAPM validation (
1.7 MB)
- Appendix B16D - CALPUFF model inputs (
1.1 MB)
EIS - Volume C: Dredging and Dredge Movements
Chapters:
- Chapter C1 - Introduction (
2.0 MB)
- Chapter C2 - Marine Geology (
3.7 MB)
- Chapter C3 - Coastal Processes and Water Quality (
4.1 MB)
- Chapter C4 - Marine Ecology (
3.6 MB)
- Chapter C5 - Shipping Traffic (
1.4 MB)
- Chapter C6 - Other Considerations (
3.8 MB)
Appendices:
- Appendix C3A - Hydrodynamic impact time series figures (
1.5 MB)
- Appendix C3B - Wave impact time series figures (
1.2 MB)
- Appendix C3C - Dredge plume TSS concentration time series figures (
1.0 MB)
- Appendix C4A - EPBC protected matters search results (
976 KB)
- Appendix C4B - Wildlife online search results (
918 KB)
EIS - Volume D: Airspace and Aircraft Noise
Chapters:
- Chapter D1 - Introduction (
10.0 MB)
- Chapter D2 - Airspace Architecture and Modes of Operation (
1.9 MB)
- Chapter D3 - Aircraft Noise (
11.7 MB)
- Chapter D4 - Air Quality and Greenhouse Gas Emissions (
MB)
- Chapter D5 - Social and Visual Impacts (
3.2 MB)
Appendices:
- Appendix D3A - Forecast schedules (
1.2 MB)
- Appendix D3B - N60 and N70 contours (
8.9 MB)
- Appendix D4A - Aircraft details (
982 KB)
- Appendix D4B - CALPUFF source information (
977 KB)
EIS - Volume E: Impact Summary and Management Framework
- Chapter E1 - Introduction (
1.1 MB)
- Chapter E2 - Matters of National Environmental Significance (
6.0 MB)
- Chapter E3 - Environmental Management Plan (
1.5 MB)
- Chapter E4 - Dredge Management Plan (
2.3 MB)
- Chapter E5 - Airspace Management Plan (
1.4 MB)
- Chapter E6 - Risk Management Plan (
1.4 MB)
- Chapter E7 - Summary of Benefits, Impacts, Commitments and Conclusion (
1.5 MB)
Last updated: 16 Mar 2023